Wechat:
  • Wison Group

  • Wison Engineering

  • Wison New Energies

Coal-to-Chemical

Wison Engineering

Address : No. 633, Zhang Jiang, Pudong New Area, Shanghai, China

Phone : +86-21-20306000

Started from syngas and coal-to-chemical projects, Wison Engineering has been committed to the development of the modern coal-to-chemical industry. In response to the clients’ needs, we offer services covering the entire project lifecycle from feasibility studies, project proposals, engineering & design, project management to start-up and operation services.

Applications

Shandong Yangmei Hengtong – 300 KTA MTO Plant Project

Shandong Yangmei Hengtong – 300 KTA MTO Plant Project

Wison undertook EPC services for the 300 KTA MTO plant and the design & engineering services for the plant’s utility and auxiliary facilities. The project featured the application of Wison Engineering’s proprietary olefin separation technology. The methanol conversion and olefin cracking used the patented UOP technology. The project kicked off on 10 June 2013 and was delivered on 30 January 2015.

Pucheng Polyethylene Plant Project

Pucheng Polyethylene Plant Project

Client: PuCheng Clean Energy Chemical Co., Ltd.

We entered into an EPC contract with PuCheng Clean Energy Chemical Co., Ltd. to build a 700 KTA polyethylene production plant. This project commenced in March 2012 and was successfully completed on January 2015. It passed a performance test organized by the owner and was awarded the “2015 National High-Quality Engineering Award” in the Chemical Industry in October 2015.

Erdos Guotai 400 KTA Coal-to-Methanol Project

Erdos Guotai 400 KTA Coal-to-Methanol Project

Client: Erdos Guotai Chemical Co., Ltd.

The project was awarded under an EPC contract.

The Rectisol plant featured the application of Wison Engineering’s proprietary techniques and technologies.

Wison (Nanjing) Clean Energy Co., Ltd.

Wison (Nanjing) Clean Energy Co., Ltd.

Phase I: EM+PC - 300 KTA CO plant;

Phase II: EPC - syngas plant (300 KTA CO, 21,000 Nm3/h H2, 11,000 Nm3/h syngas)

Phase III: E+PCM - syngas plant (1,000 t/d Shell-Wison bottom quench gasification plant and 35 KTA H2 plant)

600 KTA Methanol Project

600 KTA Methanol Project

Client: Xu Coal Mine Baoji Evergreen Energy Co., Ltd.

Wison, under an EM+PC lump sum contract, provided design management, equipment procurement, construction, commissioning, testing, and start-up services, for the project. The project began in 2011 and was completed in December 2012.

Erdos Jinchengtai Methanol Project

Erdos Jinchengtai Methanol Project

Client: Erdos Jinchengtai Chemical Co., Ltd.

Wison built a coal-to-methanol production plant for Erdos Jinchengtai Chemical Co., Ltd., in Erdos, China, under an E+PM+C contract. The project began in April 2009, the project was successfully completed in December 2012.